Lakeland, FL – The City of Lakeland Wastewater Collection Division will conduct an emergency repair on a broken sewer main in the 1400 block of George Jenkins Boulevard.
Work is scheduled to begin Tuesday, November 18, 2025, at 8:00 a.m. and is expected to last 1–2 days.
During the repair, traffic on the affected section of George Jenkins Boulevard will be reduced to one lane in each direction.The repair is required due to a break in the existing sewer main.